Project Activity Year
EO / EG III Project Piping stress dynamic analysis & AIV study” for recycle gas loop piping system in united EO/EG III project. 2022
MTBE Unit – Dehydrogenation Unit “Dynamic & Static Piping Stress Analysis” of the air Inlet, Outlet & Bypass lines involving expansion joints, to ensure the system stability. 2022
Integrated Steel Complex Production Capacity Enhancement Project Piping Stress Analysis of a process gas heater coils to ensure the complex system stability during operating as well as shutdown condition considering various thermal profiles. 2021
AR-Razi II Project 2021
EO/ EG Project Piping Stress Analysis to identify the natural frequency of the system & to stabilize the system statically & dynamically involving PHE nozzle qualification 2021
Ruwais 4th NGL Train Project Piping stress Analysis propane & butane piping system to ensure the system stability of lifting-off piping for sand blasting purpose under operating condition. 2021
Stress Analysis Educational Training Programme Piping Stress Analysis basic & advanced training programme for one of the global pipe support vendor’s Engineers 2020
50 MTPD Chlor Alkali Plant Jig Plant Piping Stress Analysis to stabilize the system statically and to keep the equipment allowable per vendor specification. 2020
JABEL Ali Refinery Expansion Project Piping Stress Analysis to identify the natural frequency of the system & to stabilize the system statically & dynamically. 2020

Upcoming Projects

Project Activity Year
PP & PDH Complex “Piping failure evaluation & resolution” for GRP UG / AG Sea water and cooling water piping system for PP/PDH unit as per Code-ISO 14692.
Ar-Razi V Project Piping Stress Analysis for an existing primary reformer’s radiation section (288 Tubes).
Ar-Razi II Project Piping support 3D Model & 2D drawing activity for existing radiant section of steam reformer furance tube/piping system.
Maaden Project tatic & Dynamic piping stress analysis of the existing discharge piping system of Bauxite Residue Disposal Pump for Ma’aden Aluminum Project to address the Excessive vibration in the piping system
DRP II Project Static & dynamic piping stress analysis of the proposed New Superheat Recycle piping system.
Cat-3F Project Static & Dynamic piping stress analysis of the existing piping system connected to Flash Tank.
JAC Project Piping stress analysis” of the different piping system (Seawater, Condensate, Turbine piping etc.